MPI Building - Auckland
-
ClientMPI Building - Auckland
-
Completed2017
-
Products
-
Glass Types
-
Architect
Project Overview
This project won the 2018 WANZ Supreme Award thanks to its impressive quality and modern design. The architect selected several façade elements – louvres, feature glass, flushglaze in varying shapes and sizes from squares and rectangles right through to complex parallelogram & trapezoid shaped windows. The project’s façade success has to be shared with a number of contributing partners, but in particular Metro Performance Glass, who supplied the glass and stunning printed graphic glass.
Unique Project Requirements
Aesthetics: MPI windows are a mixture of parallelogram and trapezoid shapes which create a great feature to the side of the building.
Visibility: Digitally printed curtain wall as a main aesthetic feature of the project.
Gallery
Summer Holiday Closure: 19 December 2025 – 12 January 2026
Metro Performance Glass will be closed for the summer break from midday Friday 19 December 2025 and will reopen Monday 12 January 2026.
Wishing you a safe, relaxing and enjoyable holiday season!