Metro Glass designed and installed the intricate Spider fixed glass canopy at the entrance, made up of 65 digitally printed panels using 17.52mm SafeLite STF Toughened Laminate (SentryGlas).
Unique Project Requirements
Our team spent many hours working alongside the Architect and our in house digital print specialists to ensure every detail was aligned, no small feat given the complex geometry. The six large pyramid/triangle forms each required a minimum 5 degree fall in multiple directions, making pattern alignment especially challenging.
Time delays due to steel design caused completion date changes and challenges, the building was meant to have been completed by November 2024 - however, it opened in Jan 2025.
Gallery
Summer Holiday Closure: 19 December 2025 – 12 January 2026
Metro Performance Glass will be closed for the summer break from midday Friday 19 December 2025 and will reopen Monday 12 January 2026.
Wishing you a safe, relaxing and enjoyable holiday season!